1 - Discussion with IR - Andy Watson is working on the alignment issue for the problem piles and hopes to have a solution Thursday.
2 - Eco merchant have sent drawing for D9 and D10 for approval. Fitting to be quoted by Eco Merchant.
3 - Electricity Power Networks paid to carry out survey and begin connecting.
4 - Discussion with Monika at SIPS uk - all ready, bar the re-working of the calculations to remove the vertical supports on the internal roof cut-aways (See images)
Construction notes for the build of the Eco House at 1 High Street Girton
Wednesday, 31 August 2011
Tuesday, 30 August 2011
30 August 2011
1 - www.pavingexpert.com - hopsack paving ??
2 - Discussion with Richard Free at CamTile RE the solar panels - information sent to JoJU and Cam tile (Email for a copy)
3 - Cross section for floor for D9 and D10 sent to Tim Bolton at Eco Merchant (Email for a copy)
4 - Piles in wrong location - SE corner of the building. IR investigating implication of the 300mm error.
5 - Pipes required for the future installation of a log burner in the livingroom to provide hot water to the Chelmer accumulator - Chelmer to provide information.
6 - Water company visiting on 9 Sept to assess - Project Ref 42321
2 - Discussion with Richard Free at CamTile RE the solar panels - information sent to JoJU and Cam tile (Email for a copy)
3 - Cross section for floor for D9 and D10 sent to Tim Bolton at Eco Merchant (Email for a copy)
4 - Piles in wrong location - SE corner of the building. IR investigating implication of the 300mm error.
5 - Pipes required for the future installation of a log burner in the livingroom to provide hot water to the Chelmer accumulator - Chelmer to provide information.
6 - Water company visiting on 9 Sept to assess - Project Ref 42321
26 August 2011
1 - Project Cam set up.
2 - Foamglass template drawn and issued to IR and MT (Michael Thompson)
3 - MT meeting to discuss rammed wall - MUST start 15 Sept.
4 - Remove grass crete from project - NH to investigate Hopsack or spaced paving options
5 - Sewer connection made by Tee Bee
6 - Awaiting DJE slab...
7 - Windows and external doors order placed.
2 - Foamglass template drawn and issued to IR and MT (Michael Thompson)
3 - MT meeting to discuss rammed wall - MUST start 15 Sept.
4 - Remove grass crete from project - NH to investigate Hopsack or spaced paving options
5 - Sewer connection made by Tee Bee
6 - Awaiting DJE slab...
7 - Windows and external doors order placed.
24 August notes
1 - Discussion with SIPS to move R2 further over the shower unit to free up space with the roof line
2 - Discussions RE the internal dormers
3 - Jo Ju to supply solar panels / integrate with CamTiles Ref Ian
4 - Chelmer heating to install full heating and control system
5 - IR - water in location under kitchen sink
6 - Discussion about Chestnut shingles - too expensive.
7 - WRC for shingle and cladding. Cam tile to drop off samples
8 - Cladding finished to OSMO mix
9 - DJE - Additional pile length dispute - IR to issue Firebrace with evidence.
10 - Clayboard - damaged board to be replaced
11 - IR to provide quote for the SIPS scaffolding
2 - Discussions RE the internal dormers
3 - Jo Ju to supply solar panels / integrate with CamTiles Ref Ian
4 - Chelmer heating to install full heating and control system
5 - IR - water in location under kitchen sink
6 - Discussion about Chestnut shingles - too expensive.
7 - WRC for shingle and cladding. Cam tile to drop off samples
8 - Cladding finished to OSMO mix
9 - DJE - Additional pile length dispute - IR to issue Firebrace with evidence.
10 - Clayboard - damaged board to be replaced
11 - IR to provide quote for the SIPS scaffolding
21 August notes
1 - IC covers replaced with cast iron as spec 3.04
2 - Car port conduit to be drilled at marked location
3 - New IC at back door -ref Ian Rudd - too many pipes for 1 IC
4 - Worked through window schedule - issue to green steps and Eco Merchant
5 - Design for D1 and D6 (email for a copy)
6 - Temporary power to IR cabin from armor cable running to Horses field.
Use for external plug when project is completed.
2 - Car port conduit to be drilled at marked location
3 - New IC at back door -ref Ian Rudd - too many pipes for 1 IC
4 - Worked through window schedule - issue to green steps and Eco Merchant
5 - Design for D1 and D6 (email for a copy)
6 - Temporary power to IR cabin from armor cable running to Horses field.
Use for external plug when project is completed.